<nav id="4ee30"></nav>

  • <ruby id="4ee30"><dfn id="4ee30"><dl id="4ee30"></dl></dfn></ruby>

  • 亚洲女同精品久久女同,亚洲一区二区三区av在线免费,午夜毛片免费看,日韩精品人妻中文字有码在线,国内精品久久久久久久97牛牛,精品无码日韩国产不卡av,久久久久久性高,久久狠狠高潮亚洲精品
    歡迎訪問沁陽市晨光實業(yè)有限公司官方網(wǎng)站!

    沁陽市晨光實業(yè)有限公司

    行業(yè)新聞

    秉持著堅持品質、責任、精心、執(zhí)著的理念,致力成為您滿意的合作伙伴,為客戶提供完善的產(chǎn)品和服務。

    位置:首頁 > 行業(yè)新聞

    玻璃鋼防腐管道安裝要求
    時間:2022-07-05  瀏覽:5705次

      Requirements for installation of FRP pipes

      1、玻璃鋼防腐管道在安裝前應對設備管口、預埋件、預留孔洞、鋼結構等涉及管道安裝的內(nèi)容進行復核。

      1. Before installation, the pipeline shall check the contents concerning the installation of the pipeline, such as the nozzle of the equipment, the embedded parts, the reserved holes and the steel structure.

      2、管道的坡度應按圖紙的要求進行調整,調整方法可以利用支座達到坡度要求,焊縫應設置在便于檢修、觀察的地方。

      2. The gradient of the pipeline should be adjusted according to the requirements of the drawings. The adjusting method can use the support to meet the gradient requirements. The welding seam should be set in a place convenient for maintenance and observation.

      3、與傳動設備連接的管道,安裝前內(nèi)部要處理干凈,焊接固定管口一般應遠離設備,以避免焊接產(chǎn)生應力對傳動設備安裝精度的影響。

      3. The pipeline connected with the transmission equipment should be cleaned before installation, and the fixed pipe mouth should be far away from the equipment to avoid the influence of welding stress on the installation accuracy of the transmission equipment.

      4、管道與機器連接前,應防止強力相對,在自由狀態(tài)下檢查法蘭的平行度和同軸度。

      4. Before connecting the pipe with the machine, the relative strength should be prevented, and the flange's parallelism and coaxiality should be checked under the free state.

      5、安全閥應垂直安裝,在投入試運行時,要及時調校安全閥。安全閥的調校在系統(tǒng)上進行,開啟和回座壓力要符合設計文件的規(guī)定。

      5, the safety valve should be installed vertically, and the safety valve should be adjusted in time for commissioning. The final adjustment of the safety valve is carried out on the system, and the opening and returning pressure must conform to the design documents.

      6、閥門安裝前,按設計文件核對其型號,并按介質流向確定其安裝方向。當閥門與管道以法蘭或螺紋方式連接時,閥門應在關閉狀態(tài)下安裝;如以焊接方式安裝時,閥門不得關閉。

      6. Before installing the valve, check its model according to the design document and determine its installation direction according to the medium flow direction. When the valve and pipe are flanged or threaded, the valve shall be installed in a closed state; if installed in a welded way, the valve shall not be closed.

      7、儀表元件的臨時替代:所有儀表元件安裝時,均采用臨時元件替代,等試壓、沖洗、吹掃工作結束后,投料前再正式安裝。

      7. Temporary substitution of instrument components: All instrument components are installed with temporary components, and are formally installed before feeding after pressure test, flushing and purging.


    主站蜘蛛池模板: 日本熟妇XXXX潮喷视频| av天堂毛片| 中文有码视频在线播放免费 | 91久久久久无码精品露脸| 色 成人 亚洲| 中文字幕爆乳julia女教师| 挺进粗大尤物人妻中文字幕 | 亚洲欧美日韩v在线观看不卡| 久久99精品国产99久久6尤物 | 亚洲中文字幕无码一区二区三区| 亚洲色大成网站www国产| 国产精品99久久久久久www| 欧美老熟妇喷水| 一级有乳奶水毛片免费| 无套中出丰满人妻无码| 伊人久久一区二区三区无码| 无码av最新无码av专区| 国产妇女馒头高清泬20P多毛| 国产黄在线观看| 一区二区三区午夜| 国产无遮挡吃胸膜奶免费看| 99精品国产闺蜜国产在线闺蜜 | 国产99久久久国产精品~~牛| 国产精品色拉拉| 激情综合婷婷色五月蜜桃| 亚洲国产福利一区二区三区| 国产98色在线 | 日韩| 日韩一区二区三区三级| 亚洲国产aⅴ综合网| 国产免国产免‘费| 无码成人AV在线看免费| 亚洲永久一区二区三区在线| 色亚洲成人| 亚洲欧美另类在线| 国产a网站| 制服丝袜无码每日更新| 国产短视频一区二区三区| 亚洲成a人片在线观看久| 中文字幕在线不卡视频| 国产精品丝袜在线不卡| 精品人妻一区二区三区日产乱码|